GS - E&C adopt four - legged robot 'Spot' on constructing sites
June 02, 2021

GS Engineering & Construction said Monday that it will begin using a four-legged robot named Spot at its construction sites following successful trials.

This is the first time the robot -- developed by American engineering company Boston Dynamics -- will be put to work on construction sites in South Korea, said the building company, which is teaming up with construction software startup Cupix.


Spot Robot By GS E&C Korea
During the tests earlier this month, Spot was equipped with cutting-edge devices such as an internet of things sensor, a 360-degree camera and a lidar device and tasked with autonomous navigation and collecting data. Lidar devices detect objects and assess their shape and distance by sending out pulses of laser light.

The collected data will be integrated with GS E&C’s preexisting building information modeling data and used to improve safety and maintenance.

Spot will also detect any harmful gas leaks and will conduct thermal imaging to maintain safety at construction sites, according to the firm.

“We plan to establish a smart building technology operating system that can respond to multiple risks on all construction sites including housing, infrastructure and plants,” one official at GS E&C said.

First developed in 2015, Spot is capable of overcoming obstacles and moving in rough terrain with ease.

  • Head Office

    Address: 10 Luong Dinh Cua Street, Thu Thiem Ward, Thu Duc City, HCM City

    Phone: (+84 28) 3740 2181

    Email:xuanhoc@gsenc.com

  • SALE OFFICE

    Address: No 88, B2 Street, An Loi Dong Ward, Thu Duc City, HCM City

    Phone: 1800 7086

    Email: cskh@gsenc.com

  • newsletter

BUILDING COMPONENTS BUSINESS
  • ZEIT ELEVATOR

    Head Office: 10 Luong Dinh Cua Street, Thu Thiem Ward, Thu Duc City, HCM City

    Hanoi Branch: 115 Tran Duy Hung, Trung Hoa Ward, Cau Giay District, Hanoi

    Factory: Lot E1, Nhon Trach 6 Industrial Zone, Long Tho Commune, Nhon Trach District, Dong Nai Province

    Phone: (+84 251) 368 2706

    Email: zeit-elevator@gsenc.com

    Website: https://zeit-elevator.com

  • VGSI AL-FORM

    Head Office: 10 Luong Dinh Cua Street, Thu Thiem Ward, Thu Duc City, HCM City

    Factory: Lot E2, 12 Street, Nhon Trach 6 Industrial Zone, Long Tho Ward, Nhon Trach District, Dong Nai Province

    Phone: (+84 251) 368 2435 Ext: 436

    Email: vgsialform@gsenc.com

    Website: https://vgsi.vn

  • VGSI PILE

    Head Office: 10 Luong Dinh Cua Street, Thu Thiem Ward, Thu Duc City, HCM City

    Factory: Lot LW1, Phu My 3 SIP, Ba Ria – Vung Tau Province

    Phone: (+84 28) 3740 2181 Ext: 353

    Email: vgsipile@gsenc.com

    Website: https://vgsi.vn

  • ZEIT GYPSUM

    Address: 10 Luong Dinh Cua Street, Thu Thiem Ward, Thu Duc City, HCM City

    Factory: D3 Road, Phu My II Expansion Industrial Zone, Tan Phuoc Ward, Phu My Town, Ba Ria – Vung Tau Province

    Tel: (+84 28) 3535 9295

    Email: zeitgypsum@gsenc.com

    Website: https://zeitgypsum.com